enquiries:
01327 358 653

Renewable Energy Works

This contract was for renewable energy works to the National Energy Foundation building in Milton Keynes. New offices were constructed as an extension to the existing building. They required the installation of geothermal energy systems to provide heating and hot water.

 

Renewable Energy Works

Renewable Energy Works

National Energy Foundation

All foul and storm drainage entered the Anglian Water drainage system via core drilling into existing manholes. All operatives were required to have confined spaces tickets.

New Geothermal energy systems were installed in the grounds via a loop system to provide heating for the heavily insulated new offices.

The contract was completed to time and within budget.